Showing posts with label inspection. Show all posts
Showing posts with label inspection. Show all posts

26 June 2012

Phase Two Pre-Drywall Inspection

Last Friday, I had the phase two framing inspection.  There were five items documented.
  • Less than 10’ separation between master bedroom air supply and air return vents.
  • Less than 10’ separation between living room air supply and return air vents.
My main concern is the air supply would return before the perimeter of the room is heated or cooled.  Ideally the air supply would been on the opposite side of the room.  The site supervisor will have the HVAC supervisor investigate and verify the design.
  • Fixed glass window is broken at side living room wall.
  • Steel straps loose and displaced at three truss web connections above left side of entry hallway ceiling.
Easy fixes.
  • Water heater combustion air vent tubes are drawing air from “vent-less” attic space – vents may be needed in closet exterior wall instead of ceiling.
Some new contruction has been done with so called ventless roof systems installed. This is where a contractor sprays an insulation product on the underside of the deck of the roof in between all the rafter spaces.

13 June 2012

Phase One Footing Inspection


Prior to the concrete being poured, my inspector and I walked the entire land to examine the post-tension and rebar placement, footing depth, and plumbing.  It was great to be there and have the inspector explain and point out what they are doing and why they are doing it.  Terminmesh keeps termites from climbing into the house around pipes.  Rebar reinforcement is done on house corners.

The inspector only documented one fix for the footing depth on the right side of the garage but we collected trash in some areas.  One area had a small piece off wood that could potentially cause termite issues down the road.  The inspection lasted one hour.  The builder fixed the issue and went a step further by sending me video clips of the fix.

12 June 2012

Week Four Footings Inspection

New Home Construction Step by Step


Before construction beings, you will have a walk-through with the site supervisor and review all designs and documents.  This is a great time to ask the supervisor questions and concerns you may have.  I was told my home would take four months to build if there are no delays such as inclement weather, materials late or items missing, workers unavailable, etc.  Below I have listed a step by step guide to building a house and where your builder currently is when they provide you a status.  A few steps such as landscaping can be moved around but for the most part this is a good guide to follow.

Excavating
Sand & Gravel
Foundation
Plumbing, Heating and Electrical
Footings Inspection

Concrete
Strip Foundation
Damp Proofing
Sewer & Water Hook-Ups
Backfilling & Grading
Slab or Skim Coat
Framing
Trusses
Heating & Plumbing
Roofing
Electrical
Alarm Prewiring
Doors & Windows
Framing Inspection

Insulation
Brick Work
Drywall

Garage Door
Siding, Soffits & Gutters
Driveway & Garage Floor
Landscaping
Cleaning
Finishing Carpentry
Moulding Shops
Painting
Cabinets
Tile Work
Plumbing
Closet Organizers
Light Fixtures
Blinds
Hardwood Floors
Carpet
Finishing
Final Inspection

10 June 2012

New Home Construction Inspection

During the construction process, the build will have both a third-party and city inspection during various stages.  Generally speaking, the third-party inspector will do a high-level inspection to check the home meets the minimum standards.  I strongly recommend hiring your own home inspector to protect your investment and provide an additional set of eyes.  The inspector will walk you through the home and explain what the builder is doing, why they are doing it, and things the builder are doing incorrectly or may have missed.  There are three recommended phases.

1. Foundation.  This is also called the footing inspection.  It is done prior to the pouring of the concrete which is the last opportunity to inspect beam and foundation depth, reinforcement, vapor barrier, plumbing penetrations, etc. before they are all buried.

2. Pre-Drywall.  The frame, also know as pre-cover inspection should be performed after all windows, plumbing rough-in, electrical rough-in, HVAC duct systems, etc. have been installed, but before insulation and interior wall finishes have been applied.  This inspection will focus primarily on structural components, plumbing and electrical rough-ins which will not be visible or accessible after the insulation and sheetrock is installed.

3. Final.  This is a full compliant inspection, which should be done a few days prior to closing, after appliances are installed and operational and most work crews have completed their work.

Your real estate agent or friends who have previously purchases homes can provide you recommendations on home inspectors.  Expect to pay $150-$200 each phase except for the final inspection.  That will depend on the size of the home.